Remodeling Tips & Cost Guides | VA Remodeling Group

Kitchen & Bathroom Remodeling in Vienna, VA

Written by Uwe | Nov 2, 2026, 1:40:32 AM

Virginia Remodeling Group remodels kitchens, bathrooms and basements in Vienna, from 1950s ramblers near Maple Avenue to newer homes across the Town and the surrounding Vienna area. A designer plans your space, you see it as a photoreal 3D render, and our own crew builds it.

Remodeling services in Vienna

  • Kitchen remodeling: opening up older layouts, islands, cabinetry and countertops
  • Bathroom remodeling: hall baths from $17K through 12/31/2026, primary suites and tub-to-shower conversions
  • Basement finishing, additions and ADUs
  • Cabinet and countertop sales and installation

What to plan for in a Vienna home

Many Vienna homes are mid-century ramblers and split-levels with compact, closed kitchens, now sitting next to larger new builds. Opening a wall, moving a sink or adding an island is common here, and older homes often need electrical or plumbing updates along the way. We plan and price those up front.

Inside the Town of Vienna, some projects need a Town zoning review first, such as additions, basement renovations and adding a wet bar, while Fairfax County issues the building permit. Interior-only work above the basement usually needs only the county permit. We check your scope, file with the right office and schedule inspections.

What a remodel costs in Vienna

  • Kitchen remodel: typically $40K–$150K+
  • Bathroom remodel: typically $18K–$65K+ (standard 5×8 hall bath from $17K through 12/31/2026)
  • Basement finishing: typically $75K–$175K+
  • Cabinet replacement: $12K–$45K+
  • Countertops: $65–$185+ per sq. ft. installed

See what each budget level includes on our 2026 pricing page.

Recent work in Vienna

A bright primary bathroom in Vienna came in at $43K. Nearby, we built a $58K light oak kitchen in Falls Church. See all projects.

How it works

A designer visits your home, measures and talks through your goals. You see the design in 3D and can change finishes or layout before anything is ordered. Then our own crew handles permits, construction and the final walkthrough. We've been designing and building for 10+ years, and our work carries a 2-year warranty.

Vienna remodeling FAQ

Do I need a Town of Vienna permit?

It depends on the work. Additions, basement renovations and wet bars typically need Town zoning review; Fairfax County issues building permits. We sort this out for you.

How long does a remodel take?

A hall bath typically takes 2–4 weeks of construction and a full kitchen 4–8 weeks.

Can I see materials first?

Yes. Visit our Chantilly showroom by appointment.

Book a free design consultation

Or call (703) 261-9106.