Virginia Remodeling Group remodels kitchens, bathrooms and basements in Centreville, right next door to our Chantilly showroom. A designer plans your space, you see it as a photoreal 3D render, and our own crew builds it.

Remodeling services in Centreville
- Kitchen remodeling: replacing builder-grade cabinets, adding islands and pantry storage
- Bathroom remodeling: hall baths from $17K through 12/31/2026, primary suites and tub-to-shower conversions
- Basement finishing, additions and ADUs
- Cabinet and countertop sales and installation
What to plan for in a Centreville home
Most Centreville homes and townhouses were built from the 1980s through the 2000s, many with the original builder-grade kitchens and baths. Swapping in better cabinets, quartz counters, tile and lighting makes a big difference, and unfinished or dated basements are a natural next step for more space.
Centreville is in Fairfax County, which issues the building permits. Many neighborhoods have HOAs that review exterior changes; interior remodels usually don't need HOA approval. We file the permits and schedule inspections.
What a remodel costs in Centreville
- Kitchen remodel: typically $40K–$150K+; essential kitchens $30K–$60K
- Bathroom remodel: typically $18K–$65K+ (standard 5×8 hall bath from $17K through 12/31/2026)
- Basement finishing: typically $75K–$175K+
- Cabinet replacement: $12K–$45K+
- Countertops: $65–$185+ per sq. ft. installed
See what each budget level includes on our 2026 pricing page.
Recent work nearby
In Chantilly, we built a $40K white classic kitchen. See all projects.
How it works
A designer visits your home, measures and talks through your goals. You see the design in 3D and can change finishes or layout before anything is ordered. Then our own crew handles permits, construction and the final walkthrough. We've been designing and building for 10+ years, and our work carries a 2-year warranty.
Centreville remodeling FAQ
Can I visit your showroom?
Yes. It's in Chantilly, a few minutes from Centreville, by appointment.
How long does a remodel take?
A hall bath typically takes 2–4 weeks of construction and a full kitchen 4–8 weeks.
Do I need HOA approval?
Usually only for exterior changes. We'll tell you if your project needs it.
Book a free design consultation
Or call (703) 261-9106.
Planning a remodel in Centreville
Real Northern Virginia cost ranges and what each service includes:
